The Process
The project began with batter boards setup, excavation, and soil compaction. Wood frames were placed, followed by pea gravel and poured concrete, which was smoothed, cured, cleaned, and sealed.
For the shed, new sole plates were installed in the 15′ x 16′ area. A deck storage frame was built with SPF lumber and covered with 4′ x 8′ plywood sheets. Waterproof house wrap was applied, and a single door with an electronic knob was installed. PlyGem Mastic vinyl siding, chosen by the client, was added, along with V11 interior roof panels for aesthetics.